News Flash Home
The original item was published from 9/28/2017 2:58:39 PM to 10/18/2017 12:00:02 AM.

News Flash

News Releases

Posted on: September 28, 2017

[ARCHIVED] News Release - Notice to Bidders for the 2017 Vineyard Street Area Drainage Project

NOTICE FOR TAKING BIDS 

 

Sealed bids will be received by the City Clerk of the City of Burlington, Iowa on October 17, 2017 until  2:00  P.M. for the 2017 Vineyard Street Area Drainage Project described in the specifications thereof now on file in the office of the City Clerk of the City of Burlington, Iowa.


Bids will be acted upon by the City Council of the City of Burlington, Iowa at a meeting to be held at the City Hall, Burlington, Iowa, on the day and hour specified, or at such later time and place as may then be fixed.


Said improvements shall consist generally of the following: 

4,520 LF of ditching, installation of 17 storm sewer structures, installation of 1,789 LF of storm sewer line (various sizes and material up to 15”), and installation of approximately 900 LF of 10” driveway culvert.

 

All work is to be done in accordance with the specifications which are now on file in the office of the City Clerk.  Said plans and specifications and the proceedings of the City Council in connection with this proposed improvement are hereby made a part of this notice by reference.

Specifications for private use may be obtained from the City Engineer of the City of Burlington, Iowa.


There will be a pre-bid meeting held on Tuesday, October 10, 2017 at 10:00 a.m. in the Conference Room of the Public Works Building, 3510 Division Street, Burlington, Iowa.


A certified check or bid bond in the amount of 5% of the total bid drawn on a solvent bank, made payable to the City Treasurer, shall be filed with each bid.  This check or bond may be cashed and the proceeds retained by the City as liquidated damages if the bidder fails to execute a contract and file an approved bond for the faithful performance thereof within 5 days after the acceptance of the bid.


The successful bidder will be required to furnish a payment and performance bond(s) in an amount equal to One Hundred Percent (100%) of the contract price; said bond(s) to be issued by a responsible surety approved by the City Council, and shall guarantee the faithful performance of the contract and the terms and conditions therein contained, and shall guarantee the prompt payment for all materials and labor, and protect and save harmless the City from all claims and damages of any kind caused by the operations of the contractor.  The contractor shall also provide a maintenance bond warranting all workmanship and materials for a period of 2 years from and after the acceptance of the work by the Burlington City Council.  The maintenance bond may be provided in the form of a combination performance, payment and maintenance bond or in the form of a separate bond from the payment and performance bond(s) in an amount equal to the contract award.


Each bid shall be made on a form furnished by the City and shall be sealed in an envelope separate from the envelope containing the certified check or bid bond.


Payment for said construction will be made from such funds of the City as may be legally used for such purpose.


The late start date for this project shall be March 19, 2018, and shall be completed no later than 80 Working Days.  


By virtue of statutory authority a preference will be given to products and provisions grown and coal produced within the State of Iowa, and Iowa domestic labor.  The contractor shall pay to all labor employed by him the rate of wages generally prevailing in the City of Burlington at the time the work is performed.


The City reserves the right to waive technicalities and the right to reject any or all proposals or division thereof.


A contract will be awarded by the City to the lowest responsible bidder for division of work desired to be completed.


AUTHORIZED BY THE CITY COUNCIL ON   September 5, 2017

                                                                              ______________________________

                                                                               Kathleen P. Salisbury, MMC

                                                                               City Clerk                       


Facebook Twitter Email

Other News in News Releases

Fall Leaf Collection

Posted on: October 10, 2023