Sign up to receive a text message or email when new bids are added!
Bid Number: 2007
Bid Title: 2020 West Avenue & Gear Avenue Dowel Bar Retrofit
Category: Public Works
Status: Closed

Description:
The purpose of this project is to repair the pavement on portions of West Avenue and Gear Avenue. The current concrete pavement has a very rough ride due to vertical faulting between panels. This project will patch portions of both roads, and place dowel bars in all unreinforced transverse joints. After reinforcement is added, the entire surface will be ground to promote a smooth surface. This treatment will prolong the life of the existing pavement and allow for an asphalt overlay to be successful in the future. This project takes place in both Burlington and West Burlington. Major Bid items include 4,476 dowel bars installed, 2.75 miles of crack and joint cleaning/filling, 14,900 SY of pavement surface repair (grinding limestone), 468 SY of Full depth finish patches, and 348.6 SY of 8” PCC pavement. The engineer’s estimate for this work is $508,000.
Publication Date/Time:
5/14/2020 1:00 PM
Publication Information:
05/14/2020 at 1:00 p.m.
Closing Date/Time:
6/2/2020 2:00 PM
Submittal Information:
City Clerk's Office, City Hall, 400 Washington Street, Burlington, Iowa by 2:00 p.m.
Bid Opening Information:
06/02/2020 at 2:00 p.m.
Addendum Date/Time:
Addendum No. 1 - May 28, 2020
Contact Person:
Jesse Howe
City Engineer
3510 Division Street
Burlington, Iowa 52601
319-753-8176
howej@burlingtoniowa.org
Business Hours:
7:30 a.m. to 5:00 p.m.
Fax Number:
319-753-8166
Plan Holders List:
A Plan Holders List is now available - May 27, 2020
Related Documents:
View Document(s)

Return To Main Bid Postings Page