Bid Title: 2017 Erosion Mitigation at Corner of North Street & North 4th Street
Category: Public Works
Status: Closed

Description:
This project provides support of an unstable approximately 1H:1V slope along North 4th Street, Burlington, Iowa by designing and installing a permanent soil nail system.  The site is located at the corner of North and 4th in Burlington, Iowa.  The finished soil nail slope shall be located within the current Right-o-way.  The final face of the finished project is anticipated to be returned to a reinforced vegetated slope.  This work shall consist of designing and constructing a permanent soil nail stabilization system at the slope locations as indicated in the plans.  The soil nail install shall furnish all labor, signed plans, drawings, design calculation, materials and equipment required to design and construct the soil nail slope in accordance with these specifications and FHWA guidelines.  The soil nail installer shall select the drilling method and equipment, final hole diameter(s) and grouting procedures, wire mesh and/or facing type and post tensioning of wire mesh facing.  The project includes the removal and replacement of existing sidewalk, railing, railing foundations, and installation of a new storm sewer inlet and 12" galvanized CMP overflow pipe.
Publication Date/Time:
5/18/2017 11:00 AM
Closing Date/Time:
6/6/2017 2:00 PM
Bid Opening Information:
6/6/17 at 2:00 p.m.
Pre-bid Meeting:
May 31, 2017 at 2:00 p.m.
Contact Person:
Jesse Howe
City Engineer
3510 Division Street
Burlington, Iowa 52601
319-753-8176
Plan & Spec Available:
See Related Documents Below
Business Hours:
7:30 a.m. to 5:00 p.m.
Fax Number:
319-753-8166
Plan Holders List:
Plan Holders List as of May 26, 2017 now available under related documents.
Miscellaneous:
Pre-Bid Meeting Minutes are now available under Related Documents - June 1, 2017